Dubai reveals Blue Line Metro trains carrying up to 1,246 passengers
The new Dubai Metro Blue Line trains have a design capacity of 675 passengers and can carry up to 1,246 per trip, with Gold Class, Silver Class and a women and children cabin.
Dubai has shown what riders on the Metro Blue Line will travel in. The Dubai Media Office released the design of the line's new trains over the weekend, a new generation of Metro carriages with smart technology, a sleeker look and more comfort inside.
The numbers first. Each train has a design capacity of 675 passengers and a total capacity of up to 1,246 passengers per trip, according to the Dubai Media Office. For comparison, the Metro trains that arrived in 2020 for Route 2020 were built to carry 696 passengers, up from 643 on the older fleet.
From the outside, the trains have a new aerodynamic shape that the designers say is inspired by power and speed, large panoramic windows and motorised sliding doors on every cabin.
Inside, the familiar three cabins stay: Gold Class, Silver Class and the Women and Children cabin, as on the Red and Green lines. Gold Class gets the most attention. It has premium seats with armrests that rotate and built-in charging points, wireless charging between seats, screens that show the time and the temperature outside, intelligent lighting and a ceiling dotted with small lights designed to look like a starry sky.
Silver Class uses contrasting colours to guide passengers as they move through the carriage, with foldable seat separators and two-tone priority seating for those who need it most. The Women and Children cabin is finished in soft blush tones on the seats and doors, so it is easy to tell apart at a glance.
The trains also carry a smart climate control system that the Dubai Media Office says saves up to 20 per cent of the energy used for air conditioning, and screens that show the current and next station, the date and time, and digital advertising.
The Blue Line is the next big addition to the network. It will have 14 stations and is designed to carry 46,000 passengers an hour in each direction, with a train roughly every two minutes, and it is due to open in September 2029. The Dubai Media Office said on 22 November that the project as a whole is now about 30 per cent complete, with 14,000 workers, engineers and supervisors on the job.
For now, nothing changes for Metro riders: the new trains will run only on the Blue Line once it opens in September 2029, and the existing Red and Green line trains stay as they are. The cabin rules will feel familiar, since the three cabin types match those on today's lines, but fares, the train supplier, the number of trains and exact opening hours for the Blue Line have not been announced. Residents of the areas the line will serve can expect more updates from the RTA as construction moves on.